The direct loop before 046ce0be was architecturally incorrect. The fabric
wiring removed it and exposed the slowdowns, and the instruments (ASan,
UBSan, perf) locate them.
FABRIC-3 XLVIII.24 and .25 and both 11-17 plans are corrected in place,
and every measurement is kept. Mechanism A is the first speed-up found,
not a fix.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_017RzZgrf7V7Zk2iczBXDRbm