Captain Bob, 2026-11-11: "I'm thinking about adding a CAPA & FMEA GATE to our build pipelines", then yes to writing it up. A nightly.sh quality stage run in the acceptance gate: every kind/escaped issue has a CAPA record whose preventive control exists and runs in a stage; every FMEA row over the threshold has a control in the gate. Seeded with five CAPAs from 2026-11-11. Five points to rule (section 7). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_017RzZgrf7V7Zk2iczBXDRbm