The plug-and-play stick (#92 Tasks 1-3) and a BAM flush that moves only the volume (#155) #159

Merged
rajames merged 58 commits from StarForth-v4.0.0 into master 2026-11-08 17:51:56 +00:00
Showing only changes of commit a55571b25d - Show all commits
+14
View File
@@ -6393,3 +6393,17 @@ Plan `2026-10-29-stick-5`, Task 2; `STICK.md` 5a (its 2 TiB cap amended to 256 G
table of stack notations and descriptions in the tree, and the build fails when a live word has
no entry -- so it cannot fall behind v4's 317 words (`docs/reference/DICTIONARY.md` is v3's, and
goes with v3).
### 12. A DoE per release (2026-11-08)
- **Ruled** (Captain Bob): "a pipeline that will run and publish a DoE of some small kind we can use
to support patent claims to a SMALL degree ... R and LaTeX ... published each release on .com's
XWiki with charts and tables in the XWiki dialect. This will be a milestone too." Milestone **DoE
per release**, #158.
- **Found:** the R and LaTeX pipeline exists (`experiments/bare_metal/analysis/`), but it measured
v3's physics runtime, which goes with v3 (#156), and no DoE has run since 2026-09-16 (#141). So
the per-release DoE measures v4, from the release's own image.
- **My calls:** the design fixed and published before it runs; effect sizes with confidence
intervals; every run reported, failures included; the report states its limits (TCG, one server,
the sample). Rulings left for the milestone's start: the claim, the factors, the time budget,
charts as R images or XWiki's `{{chart}}` macro, where the pages sit.