CONNECT-HERMES (birthed the removed hermes:init.4th; always failed) and ARTEMIS-ANNOUNCE-READY (no callers) are gone; DoE CSV column 17 is now hestia_heat_q48, same position. New baseline on all three ISAs: word_count 544, M7.1a hash 0x927513aabd543433, Hera 0x4953a2e2d11fff34, Artemis 0xc5a8cff4b805b6a0, Hestia unchanged. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
experiments/
Design of Experiments (DoE) campaign data and analysis for the LithosAnanke kernel.
bare_metal/— the bare-metal DoE experiment: blind full-factorial 2⁴ runs measuring the L8 Jacquard mode selector's effect on the Steady-State Machine across amd64/aarch64/riscv64. Seeexperiments/bare_metal/README.mdfor the full directory layout (runs/,latest/,analysis/{charts,tables,report}).
Hosted-VM DoE campaigns (factorial/heartbeat/ablation studies) live under
docs/working/experiments/ instead — this top-level directory is
specifically the kernel/bare-metal side.