- DOE sets up, JOINs EV-DONE and starts trial 1, then returns. Each trial
births and sends WL-RUN only; completion arrives as the OS's EV-DONE.
- ON-DONE counts this campaign's own workers while active; the last one
ends the trial (KILL all, marker, persist) and starts the next, or
finishes (HB-OFF, UNJOIN, MU-CAMPAIGN: complete). MU-WAIT-ALL is gone;
the start/end cycle goes through MU-END-XT.
- WL-DONE-ARGS removed from all ten workload capsules; lint passes.
Smoke campaign (amd64, 1 rep, rows off per Captain Bob): DOE returns, the
prompt answers mid-trial, all 6 trials chain on events, fail=0 each,
28/28 born/killed/departed, MU-CAMPAIGN: complete in ~61 min. Standard
sequence passes on all three ISAs (with the xHCI fix it exposed, df150e86).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
experiments/
Design of Experiments (DoE) campaign data and analysis for the LithosAnanke kernel.
bare_metal/— the bare-metal DoE experiment: blind full-factorial 2⁴ runs measuring the L8 Jacquard mode selector's effect on the Steady-State Machine across amd64/aarch64/riscv64. Seeexperiments/bare_metal/README.mdfor the full directory layout (runs/,latest/,analysis/{charts,tables,report}).
Hosted-VM DoE campaigns (factorial/heartbeat/ablation studies) live under
docs/working/experiments/ instead — this top-level directory is
specifically the kernel/bare-metal side.