- Both looked up the retired Hermes VM and printed SKIPPED on every boot.
Drain test: target Hestia, nested VM-EXEC of "1 DROP". Policy test:
Hestia is the no-policy VM (never loads ACL.4th). A missing target now
prints FAIL, not SKIPPED.
- Both PASS on amd64/aarch64/riscv64; standard sequence passes (hash, G,
MINT/WIREBIND/USE, conserved, 0 idle growth). Ledger baseline now
pulled 262144 / returned 259359 (the drain test's real message).
- Found, not fixed: ARTEMIS-ANNOUNCE-READY, doe_log's "Hermes" heat
column and CONNECT-HERMES still reference the retired Hermes VM.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>