The per-ISA amd64 campaign (12345 3 S" amd64" DOE) was stopped ~49 min in, zero trials complete: its harness drives workers by synchronous VM-EXEC on Hera's stack, so the concurrency factor counted resident VMs while execution stayed serialized. Tracing further showed the v2.1.0 reshuffle stops short of real concurrency: kernel-Hermes never publishes eligibility (no mark_work in sk_hermes_send_one), the switch trampoline is still the Stage-2 placeholder, delivery to passive VMs still goes through the idle pump, only Tripod/WIREBIND VMs are switch participants, and the stack-ownership gate is a single global. FABRIC-3.8.md records the gap analysis and a staged A-I design, each stage its own commit and 3-arch acceptance. FABRIC-3.md SXXXV.16 points to it. Logs and extracted CSVs from today's boots and the stopped run are kept as audit artifacts. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
experiments/
Design of Experiments (DoE) campaign data and analysis for the LithosAnanke kernel.
bare_metal/— the bare-metal DoE experiment: blind full-factorial 2⁴ runs measuring the L8 Jacquard mode selector's effect on the Steady-State Machine across amd64/aarch64/riscv64. Seeexperiments/bare_metal/README.mdfor the full directory layout (runs/,latest/,analysis/{charts,tables,report}).
Hosted-VM DoE campaigns (factorial/heartbeat/ablation studies) live under
docs/working/experiments/ instead — this top-level directory is
specifically the kernel/bare-metal side.